One in every of the applied sciences adopted by the Federal Motorway Administration’s Every Day Counts initiative, this video illustrates easy recommendations to originate the Geosynthetic Reinforced Soil-Integrated Bridge System (GRS-IBS). It is supposed to educate designers, engineers, contractors and inspectors on the basics of the GRS-IBS. The video follows the GRS-IBS Intervening time Implementation Guide (FHWA-HRT-11-026) realized here: http://www.fhwa.dot.gov/publications/study/infrastructure/structures/11026/

Incorporated within the video are the next:

• Clarification of GRS and its history of vogue

• Interviews with designers, homeowners and building personnel

• Narrated video photographs to recount the building of the three major parts: reinforced soil foundation; abutment; and integrated formula

• Time lapse pictures to show the rate of making

[CLOSED CAPTIONED]